top of page

Biodiversity Impact Assessments

Biodiversity Impact Assessement

Camphora works with our partners to conduct biodiversity baseline studies within terrestrial, aquatic, mangrove and marine ecosystems to understand the impacts of future developments on these ecosystems. Our assessments help developers to refine development plans that reduce impacts on biodiversity and create new habitats wherever possible.

Field researcher doing fieldwork in mangroves

Biodiversity Impact Assessments

Number 1.png

Collect & analyse baseline biodiversity data 

By mapping the vegetation found onsite and conducting surveys to identify the fauna species present, we identify key habitats and sensitive floral and faunal receptors that would be affected by proposed construction works for development projects.

Number 2.png

Predict & evaluate impact on biodiversity

By comparing project design to identified receptors, we evaluate the impact of specific construction works on important habitats as well as sensitive floral and faunal groups onsite. This is done in consideration of larger, long-term conservation efforts within the local context. 

Number 3.png

Propose mitigation measures

We work with clients, architects, landscape architects and engineers, technical agencies and representatives from nature groups, to recommend design solutions to conserve key important habitats identified onsite and to prescribe site specific measures necessary to safeguard biodiversity and enhance wildlife connectivity.

Notable Projects

man with lifejacket standing on the shoreline of Pulau Ubin

Pulau Ubin Shoreline Works & Coastal Boardwalk

pair of sunda slow loris in tree

Thomson Nature Park

Man standing in ferns cross island line

Cross Island Line Phase 2

LCK circle .jpg

Lim Chu Kang Region

Berylayer circle.jpg

Keppel & 

Surrounding Areas

Camphora works with consultants and contractors to formulate adaptive Environmental Management and Monitoring Plans to reduce risk of excessive habitat loss, fauna mortality and human wildlife conflicts. In addition to setting up frameworks and conducting regular surveys throughout the duration of the construction works, our team is equipped to recommend specific solutions based on project conditions and situations.

Palm Oil Arborculture chainsaw tree trimming

Environmental Management & Monitoring

Number 1.png

Reforestation & transplanting works

Where there are plants of conservation significance, we identify individuals for harvesting and transplant and prepare method statements inline with specific needs of different species. In larger forested sites, reforestation strategies may be developed in consultation with design teams and technical agencies to jump start the forest succession process, increase plant diversity, create habitats and improve fauna connectivity.

Number 2.png

Fauna relocation

Where suitable and needed, we propose fauna relocation for species affected by construction in consultation with technical agencies. Feasibility studies prior to the relocation include the scouting of suitable host sites, and carrying out literature review on suitable host sites to ensure that as much as possible, affected individuals remain in similar environments.

Number 3.png

Focal faunal species surveys

We help to monitor focal faunal species groups to assess and understand changes in species behaviour due to ongoing construction works. With the data collected, we provide recommendations on site- and species-specific wildlife management strategies.

Notable Projects

J107 circle .jpg

J107

Bird park EMMP circle.jpg

Mandai West Arrival Node

& Bird Park

Eco lodge circle.jpg

Mandai Resort

RR circle.jpg

Rifle Range Nature Park

Baseline & Impact Assessment 

CROSS ISLAND LINE PHASE 2 (On-going)

Client: Land Transport Authority

​

ENVIRONMENTAL BASELINE STUDY AT THE

LIM CHU KANG REGION (On-going)

Client: Singapore Food Agency

​

ENVIRONMENTAL IMPACT ASSESSMENT AT

KEPPEL & SURROUNDING AREAS (2022)

Client: Housing and Development Board &

Urban Redevelopment Authority

​

SOUTHERN TENGAH/TENGAH TOWN (2021)

Client: Housing and Development Board

​

SENTOSA DEEP GRAVITY SEWER (2020)

Client: Sentosa Development Corporation

​

NANYANG PIPELINE (2020)

Client: Public Utilities Board

​

NEO TIEW LAND PREPARATION WORKS (2020)

Client: National Environment Agency

​

YISHUN NEIGHBOURHOOD 5 (2020)

Client: Housing and Development Board

​

MOUNT PLEASANT MASTER PLAN (2019)

Client: Housing and Development Board

MOUNT FABER FUNICULAR SYSTEM AND MASTER PLAN (2019)

Client: Mount Faber Leisure Group  

​

SENTOSA ALPINE COASTER (2019)

Client: Sentosa Development Corporation

​

WOODLANDS NORTH COAST (2019)

Client: Housing and Development Board

 

BAHAR/ CLEANTECH PARK  MASTER PLAN (2018)

Client: JTC Corporation

​

BROOKVALE FOREST (2018)

Client: Hoi Hup Realty

​

BULIM PHASE 2 MASTER PLAN (2018)

Client: JTC Corporation

​

PULAU SEMAKAU (2018)

Client: National Environment Agency  

​

PULAU UBIN SHORELINE WORKS &

COASTAL BOARDWALK (2018)

Client: National Parks Board

​

SISTERS’ ISLAND MARINE PARK (2018)

Client: National Parks Board

​

SPRINGLEAF FOREST  CONSERVATION PLANNING (2018)

Client: National Parks Board, Urban Redevelopment Authority

​

SUNGEI BULOH WETLAND RESERVE (2018)

Client: Singapore Police Force  

​

JURONG ECO GARDEN (2017)

Client: JTC Corporation

​

THOMSON, BUKIT BATOK NATURE  PARKS (2016)

Client: National Parks Board

​

RAPID TRANSPORT SYSTEM (2015)

Client: Land Transport Authority  

​

Arboriculture

ST ANDREW’S CATHEDRAL

(since 2012)

Arboriculture

Client: St Andrew’s Cathedral

​

CHANGI AIRPORT, TERMINAL 4 (2017)

Horticulture

Client: Changi Airport Group

​

TERMINAL 4 RAIN TREE TRANSPLANT (2016)

Arboriculture

Client: Changi Airport Group

​

PUNGGOL DIGITAL DISTRICT (2016)

Arboriculture

Client: JTC Corporation

​

THE SIENA (2014)

Arboriculture

Client: Far East Organisation 

 

BISHAN-BRADDELL DRAINAGE  IMPROVEMENT WORKS (2014)

Arboriculture

Client: Public Utilities Board

​

BISHAN - ANG MO KIO PARK (2009)

Arboriculture and Horticulture

Client: Ramboll Studio Dreiseitl

​

BASF Learning Campus (2014)

Arboriculture

Client: BASF 

Habitat Enhancement,
Creation & Design

BIDADARI HDB C15 & 16 (2020)

Client: Housing and Development Board

​

RESEARCH ON MAINTENANCE OF URBAN 

LANDSCAPES (2020)

Client: National University of Singapore

​

JURONG ECO GARDEN (2021)

Client: Ramboll Studio Dreisetl

​

RIFLE RANGE NATURE PARK (On-going)

Client: National Parks Board

​

BAY EAST (2019)

Client: Gardens by the Bay 

​

HUDHUFUSHI RESORT, MALDIVES (2018)

Client: Salad Dressing

​

YUSOF ISHAK SECONDARY  SCHOOL (2018)

Client: Ministry of Education

​

MANDAI RESORT  (On-going)

Client: Mandai Park Holdings

Mangrove & Coastal Habitat Restoration 

Environmental Management & Monitoring

PULAU UBIN SHORELINE WORKS & COASTAL BOARDWALK (2018)

Client: National Parks Board

PULAU TEKONG MANGROVE RESTORATION (2009)

Client: Housing  and Development Board

MANDAI WEST ARRIVAL NODE & BIRD PARK 

(On-going)

Client: Mandai Park Holdings

J107  (On-going)

Client: Land Transport Authority

RIFLE RANGE NATURE PARK (On-going)

Client: National Parks Board

BUKIT TIMAH GOLF COMPLEX  (2020)

Client: Temasek Club

Download our full company profile below

flying purple heron
Contact Us

Interested in working with us? Send us an email! â€‹

  • LinkedIn

©2024 Camphora Pte Ltd

bottom of page